Africa low cost Double Storey prefabricated Steel Structure Workshop With Warehouse Office in Senegal Cote d'Ivoire Guinea Sierra Leone
- Steel Structure Warehouse
- Steel Structure Workshop
- Poultry Steel Structure
- Multi-storey Steel Structure
- School Steel Building
- Hospital Steel Structure
- Hotel Steel Building
- Stadium Steel Structure
- Airport Steel Structure
- Train Station Steel Structure
- Light Steel Villa
- Membrane Structure
- Steel Structure Buildings
Africa low cost Double Storey prefabricated Steel Structure Workshop With Warehouse Office in Senegal Cote d'Ivoire Guinea Sierra Leone
Categories | Steel Structure Warehouse |
---|---|
Brand | ZYM steel structure building Manufacturer |
Model | ZYM1 |
Name | Steel Structure Workshop With Warehouse Office in |
Key word | Steel Structure Workshop Warehouse Cote d'Ivoire |
Design | 3D max,CAD for steel structure frame |
Material | Q235,Q345B,SS400 steel structure |
Foof | Galvanized color sheet or sandwich panel |
Wall | Galvanized sheet for steel structure workshop |
Place of project | Indonesia steel structure workshop and warehouse |
Delivery time | 30 days after steel structure drawing confirmation |
Package | Steel structure frame pallet for 40HQ container |
Application | workshop,warehouse,office,commercial bulding,shop |
FOB port | Qingdao Guangdong Shanghai |
Terms of Payment | L/C, D/A, Western Union, T/T |
Update Time | Nov 6,2024 |
How to build a double story steel structure workshop with warheouse and office in Africa?
----------------------Africa low cost Double Storey prefabricated Steel Structure Workshop With Warehouse Office in Senegal Cote d'Ivoire Guinea Sierra Leone
Ⅰ-Communication And Design
Specificaitons as follows:
a) Provide all the structural steel required for the building which includes foundation anchor bolts, columns, Beams, Roof Beams, Roofing sheets, bolts…etc. (All the steel structure should be epoxy painted).
b) Provide all the Cladding material for the building wall including all required framing for fixing of cladding.
c) Provide all steel structure mezzanine decking materials.
d) Provide all staircases mentioned in the drawing. Tread: 280mm, Height: 167mm.
e) Provide hand railings (staircase) and railings (decks) as per shown in the drawings.|
f) Provide steel structure building Roofing Sheets including purling, heat insulation material and all required material for fixing of Roof.
g) Careful procedures for steel structure frame erection drawings giving importance to the given drawings.
h) Provide all railings including staircase railings in Stainless steel
i) Provide structural steel parts drawings and structural calculations ) steel Foundation and any other required civil work related designs should be provided.
k) Foundation of the steel structure building should be constrained within the build area and should not extend outside.
l) The steel structure warehouse Load bearing capacity of the soil should be 150 kn/m2.
m) Foundation depth should be 2 meter
The steel structure workshop layout and elevation are designed as follows:
Ⅱ- Confirmation drawings -Production-QC
Ⅲ Erection
1.5 DEFECT & PROTECTION DURING DELIVERY
During Delivery all delicate workshop materials shall be carefully handled and stored under cover in a manner to prevent deformation and damage to the materials and to prevent rusting and the accumulation of mud, dirt or other foreign matter on the metal work.
Tag:steel workshop, steel structure buildings
For further information feel free to contact us.
E-mail: sales@zyminfra.com
Whatsapp:+8618561962040
- Steel Structure Warehouse
- Steel Structure Workshop
- Poultry Steel Structure
- Multi-storey Steel Structure
- School Steel Building
- Hospital Steel Structure
- Hotel Steel Building
- Stadium Steel Structure
- Airport Steel Structure
- Train Station Steel Structure
- Light Steel Villa
- Membrane Structure
- Steel Structure Buildings